Phone: 800-323-5749 / Fax: 308-382-0253 / Hours: 7:30am-5:00pm CST (Mon-Fri)
Shipping available for: United States Canada
  • Simplified Installation
  • Installation Instructions Included
  • Engineered for Precise Fit
  • Long Lasting Steel or Cast Iron Pulleys
  • In-Line Kit for Low-Torque Applications
  • Most Kits Fit Trucks Equipped With or Without AC
  • There are many kits available.
  • Let us help you choose. What we need to know: Year, Make, Model, Gas or Diesel, Engine Size.
*** Slide left / right to view more ***
ImageItem #YearChasisLiterC.I.D.EnginePriceOrder Qty.
64202552005-2007LCF SERIES4.5275V6 DIESEL / VT275 $575.39 / EACH
Usually ships in 3 day(s)
64202562005-2009LCF SERIES4.5275V6 DIESEL / VT275 $736.15 / EACH
Usually ships in 3 day(s)
64202572008-2009LCF SERIES4.5275V6 DIESEL / VT275 $515.31 / EACH
Usually ships in 3 day(s)
64202581987-1993S 1700-18005.9360I6 DIESEL / DTA360 $362.15 / EACH
Usually ships in 3 day(s)
64202591989-1993S 1700-18005.9360I6 DIESEL / DTA360 $765.77 / EACH
Usually ships in 3 day(s)
642026020164300-4400 DURASTAR6.7CUMMINS ISB $758.15 / EACH
Usually ships in 3 day(s)
64202611973-1988S 1800-26007.6466I6 DIESEL / DT466 $419.69 / EACH
Usually ships in 3 day(s)
64202621989-1993S 1800-26007.6466I6 DIESEL / DTA466 $363.00 / EACH
Usually ships in 3 day(s)
64202631989-1993S 1800-26005.9 / 7.6360 / 466I6 DIESEL / DTA360 / DTA466 $720.92 / EACH
Usually ships in 3 day(s)
64202641989-1993S 1800-26007.6466I6 DIESEL / DTA466 $765.77 / EACH
Usually ships in 3 day(s)
64202651993 1/2S 1800-26007.6466I6 DIESEL / DTA466 $765.77 / EACH
Usually ships in 3 day(s)
64202661994-20014000 SERIES6.7 / 7.6 / 8.7408 / 466 / 530I6 DIESEL / DT408 / DT466 / DT530 $750.54 / EACH
Usually ships in 3 day(s)
64202671994-20014700-49006.7 / 7.6408 / 466I6 DIESEL / DT408 / DT466 $511.92 / EACH
Usually ships in 3 day(s)
64200222002-20044300-44007.6466I6 DIESEL / DT466 $511.92 / EACH
Usually ships in 3 day(s)
64200352005-20074300-44007.6 / 8.7466 / 530I6 DIESEL / DT466 / DT530 $598.23 / EACH
Usually ships in 3 day(s)
   Page of 2